<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns="http://www.w3.org/2005/Atom"  xmlns:media="http://search.yahoo.com/mrss/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" xmlns:georss="http://www.georss.org/georss" xmlns:photo="http://www.pheed.com/pheed/">
 <title>Daily CSR</title>
 <subtitle><![CDATA[Daily CSR delivers latest news and in-depth coverage about corporate social responsibility, ethics and sustainability]]></subtitle>
 <link rel="alternate" type="text/html" href="https://www.dailycsr.com" />
 <link rel="self" type="text/xml" href="https://www.dailycsr.com/xml/atom.xml" />
 <id>https://www.dailycsr.com/</id>
 <updated>2026-09-12T03:43:23+02:00</updated>
 <generator uri="http://www.wmaker.net">Webzine Maker</generator>
  <icon>https://www.dailycsr.com/favicon.ico</icon>
  <entry>
   <title>Vale Base Advances Salobo Copper Project</title>
   <updated>2026-08-18T12:18:00+02:00</updated>
   <id>https://www.dailycsr.com/Vale-Base-Advances-Salobo-Copper-Project_a6059.html</id>
   <category term="Companies" />
   <photo:imgsrc>https://www.dailycsr.com/photo/art/imagette/97728976-68035316.jpg</photo:imgsrc>
   <published>2026-08-18T12:13:00+02:00</published>
   <author><name>Debashish Mukherjee</name></author>
   <content type="html">
    <![CDATA[
     <div style="position:relative; text-align : center; padding-bottom: 1em;">
      <img src="https://www.dailycsr.com/photo/art/default/97728976-68035316.jpg?v=1787048298" alt="Vale Base Advances Salobo Copper Project" title="Vale Base Advances Salobo Copper Project" />
     </div>
     <div>
      <div style="text-align: justify;">Vale Base, a leading global supplier of critical minerals, has announced its decision to move forward with the Coarse Particle Flotation (CPF) project at its Salobo Copper Complex in Brazil. The expansion is expected to significantly increase processing capacity and copper production while delivering strong economic returns. <br />   <br />  The company now expects the project to begin operations in the first half of 2028, around a year ahead of its original schedule. According to Vale Base, the accelerated timeline reflects improvements in its construction strategy and a broader transformation of its project execution model, designed to increase flexibility, speed and efficiency while maximizing returns across its portfolio. <br />   <br />  The CPF project is expected to increase Salobo's annual ore-processing capacity by 6 million tonnes, taking total capacity to approximately 42 million tonnes per year. Copper production is forecast to rise by up to 30,000 tonnes of contained copper annually, alongside approximately 15,000 ounces of additional gold produced as a byproduct. The expansion follows record production levels at Salobo in 2024 and 2025. <br />   <br />  "CPF demonstrates VBM's ability to generate substantial value from world-class assets through disciplined execution, innovation and effective capital allocation," said Shaun Usmar, CEO of VBM. "Salobo is already among the world's leading copper operations, and the project will allow us to increase copper production more efficiently by making greater use of existing infrastructure while also improving environmental performance." <br />   <br />  Usmar said the accelerated development was particularly significant given the industry's challenges in bringing new copper supply to market. He noted that VBM recently announced the early completion of its Bacaba copper project by six to nine months and has now brought forward Salobo's CPF project by approximately one year. He said the progress highlights the strength of VBM's copper pipeline and its ability to reduce project risks while delivering capital-efficient, high-return developments. <br />   <br />  <strong>CPF Project Designed to Address Processing Bottlenecks</strong> <br />  The CPF project is a brownfield expansion that will make use of Salobo's established infrastructure and high-quality orebody, helping to limit construction and execution risks. Salobo is Brazil's largest copper operation and is considered a long-life cornerstone asset for VBM. <br />   <br />  The new flotation circuit will enable waste rock to be separated earlier in the processing chain, reducing the amount of material requiring grinding. This is expected to ease existing grinding constraints, improve metallurgical recoveries and allow the plant to process greater volumes of ore. <br />   <br />  The technology is also expected to lower the operation's environmental footprint by reducing average energy and water consumption compared with conventional processing approaches. <br />  As part of Salobo's broader strategic plan, total mine movement is expected to increase by around 7%. This growth will be supported by several operational initiatives, including the deployment of new autonomous haulage equipment. <br />   <br />  VBM also secured the construction license for the CPF project from Brazil's Institute of Environment and Renewable Natural Resources (IBAMA) ahead of schedule, allowing implementation to commence earlier than originally planned. <br />   <br />  <strong>Wheaton to Provide $40 Million in Project Funding</strong> <br />  Wheaton Precious Metals has agreed to contribute $40 million toward the project's capital requirements. The funding will be provided in two $20 million installments linked to specific project milestones. <br />   <br />  The payments will replace future milestone payments under the existing Salobo streaming agreement. Under that arrangement, Wheaton could have been required to make annual payments of up to $8 million to VBM for as many as 10 years if a high-grade mine plan had been introduced. <br />   <br />  VBM has also streamlined the CPF project's scope, reducing its estimated capital requirement to approximately $215 million, compared with the earlier estimate of $225 million to $275 million. After accounting for Wheaton's contribution, VBM's net capital expenditure is expected to be approximately $175 million. <br />   <br />  The project's capital intensity is estimated at between $5,000 and $6,000 per copper-equivalent tonne, significantly below the industry average. <br />   <br />  Usmar described the arrangement as mutually beneficial, noting that Wheaton's $40 million contribution further strengthens the project's already attractive economics while allowing Wheaton to benefit from increased gold byproduct production. <br />   <br />  Haytham Hodaly, President and CEO of Wheaton Precious Metals, said the company was pleased to support the CPF expansion, describing Salobo as a cornerstone asset and emphasizing Wheaton's commitment to partnering with high-quality operators on projects capable of creating long-term value. <br />   <br />  <strong>Key Salobo CPF Project Estimates</strong></div>    <table border="0" cellpadding="0">  	<thead>  		<tr>  			<th style="text-align: justify;"><strong>Metric</strong></th>  			<th style="text-align: justify;"><strong>Estimate</strong></th>  		</tr>  	</thead>  	<tbody>  		<tr>  			<td style="text-align: justify;">Additional processing capacity</td>  			<td style="text-align: justify;">6 million tonnes per year</td>  		</tr>  		<tr>  			<td style="text-align: justify;">Incremental copper production</td>  			<td style="text-align: justify;">Up to approximately 30,000 tonnes per year</td>  		</tr>  		<tr>  			<td style="text-align: justify;">Incremental gold production</td>  			<td style="text-align: justify;">Approximately 15,000 ounces per year</td>  		</tr>  		<tr>  			<td style="text-align: justify;">VBM capital expenditure after Wheaton funding</td>  			<td style="text-align: justify;">Approximately $175 million¹</td>  		</tr>  		<tr>  			<td style="text-align: justify;">Internal rate of return</td>  			<td style="text-align: justify;">More than 50%</td>  		</tr>  		<tr>  			<td style="text-align: justify;">First commercial production</td>  			<td style="text-align: justify;">First half of 2028</td>  		</tr>  	</tbody>  </table>    <div style="text-align: justify;"> <br />  <strong>Technology, Research and Collaboration</strong> <br />  VBM began researching CPF technology for Salobo more than two years ago. The company has conducted extensive laboratory testing at its Sheridan Park Research Facility in Canada while working with industry specialists and technical partners. <br />   <br />  Field trials have helped validate the project's design assumptions and are continuing at VBM's pilot facility in Brazil's Carajás region. The testing is also supporting operational training and generating additional insights ahead of commercial implementation. <br />   <br />  VBM is evaluating opportunities to deploy CPF technology at other copper projects in Carajás and elsewhere across its portfolio. The company is also investigating potential applications for the technology in polymetallic ore bodies. <br />   <br />  The decision to proceed with the project reflects VBM's broader emphasis on technology, collaboration and innovation as tools for reducing development risks and drawing on the company's technical expertise to generate additional value. <br />   <br />  ¹ Assumes a BRL/USD exchange rate of 5.20. <br />   <br />  <strong>Strong Copper Growth Pipeline</strong> <br />  The Salobo CPF expansion forms part of VBM's broader copper growth pipeline in Brazil. The company has more than 53 million tonnes of contained copper across its mineral reserves and resources, including inferred resources. <br />   <br />  VBM's growth strategy targets annual copper production of approximately 700,000 tonnes by 2035. Much of this growth is expected to come from its Brazilian resource base and projects in the Carajás region, where the company already has a substantial operating presence and established infrastructure. <br />   <br />  The concentration of VBM's operations and development projects near existing mining complexes, processing plants, logistics networks and power infrastructure is expected to support a more capital-efficient approach to expanding copper production.</div>  
     </div>
     <br style="clear:both;"/>
    ]]>
   </content>
   <link rel="alternate" href="https://www.dailycsr.com/Vale-Base-Advances-Salobo-Copper-Project_a6059.html" />
  </entry>
  <entry>
   <title>Smart Mining with Cummins PrevenTech: Data-Driven Engine Reliability</title>
   <updated>2025-09-01T15:19:00+02:00</updated>
   <id>https://www.dailycsr.com/Smart-Mining-with-Cummins-PrevenTech-Data-Driven-Engine-Reliability_a5074.html</id>
   <category term="Companies" />
   <photo:imgsrc>https://www.dailycsr.com/photo/art/imagette/90834523-63981298.jpg</photo:imgsrc>
   <published>2025-09-01T15:17:00+02:00</published>
   <author><name>Debashish Mukherjee</name></author>
   <content type="html">
    <![CDATA[
     <div style="position:relative; text-align : center; padding-bottom: 1em;">
      <img src="https://www.dailycsr.com/photo/art/default/90834523-63981298.jpg?v=1756732774" alt="Smart Mining with Cummins PrevenTech: Data-Driven Engine Reliability" title="Smart Mining with Cummins PrevenTech: Data-Driven Engine Reliability" />
     </div>
     <div>
      <div style="text-align: justify;">The mining sector is undergoing a significant transformation in how engine performance is monitored and maintained. With the rise of advanced digital tools, operators can now detect irregularities and potential issues much earlier, preventing severe breakdowns and avoiding costly repairs. By ensuring engines consistently perform at their best, these innovations mark a new standard of reliability in mining operations. <br />   <br />  While connected diagnostics isn’t a brand-new concept, it continues to evolve, delivering greater value to miners. Embracing these advancements is becoming essential for operators who want to maximize efficiency and maintain a competitive edge. <br />   <br />  <strong>Why Digital Solutions Matter</strong> <br />  Mining engines are both massive and expensive, yet many companies still depend on outdated IoT systems that provide limited visibility into performance and early warning signs. Without real-time monitoring, small problems can escalate into major failures. <br />   <br />  Modern digital platforms solve this challenge by offering live insights into equipment performance. Cummins’ PrevenTech® takes the approach further, leveraging proprietary data that only Cummins can interpret, providing highly detailed assessments of engine health. This allows for precise, proactive interventions that reduce downtime and cut maintenance costs. <br />   <br />  In harsh and remote mining environments, an unexpected engine failure can not only be costly but also put workers at greater risk. Early detection prevents small faults from growing into dangerous situations, ultimately improving reliability, lowering total cost of ownership (TCO), and enhancing safety on site. <br />   <br />  <strong>Driving Better Design</strong> <br />  Beyond everyday monitoring, Cummins PrevenTech® feeds valuable field insights back into the product development cycle. By incorporating real-world data into engineering, Cummins continuously enhances the performance and durability of its engines. This creates a feedback loop of secure, targeted intelligence that fuels the development of stronger, more efficient power solutions. <br />   <br />  <strong>Smarter Mining with Advanced Prognostics</strong> <br />  Cummins is also pushing the boundaries of prognostics by enabling its systems to learn from live data and adapt to mining-specific conditions. This makes equipment more intelligent, efficient, and sustainable. <br />   <br />  In one recent case study, Cummins used AI to process more than 80 million data points from 50 QSK60-powered trucks. The analysis uncovered hidden inefficiencies that would have otherwise gone unnoticed or taken far longer to detect. By identifying and replacing faulty components, fleet speed increased by 0.3 km/h and overall productivity rose by 1%. Additionally, injector tip failure downtime was reduced by 97%, cutting repair times from 120 hours to just four. These improvements saved miners millions, proving the impact of data-driven insights on operational performance. <br />   <br />  <strong>Preparing for the Future</strong> <br />  For mining to remain safe, efficient, and profitable, fleets must adopt today’s digital solutions while preparing for even more advanced analytics on the horizon. <br />   <br />  According to Arul Antony, Engineering Leader at Cummins:&nbsp;“Predictive, data-driven maintenance isn’t the future—it’s already here. Operators who embrace it now will set the standard for safety, efficiency, and profitability in mining.”</div>  
     </div>
     <br style="clear:both;"/>
    ]]>
   </content>
   <link rel="alternate" href="https://www.dailycsr.com/Smart-Mining-with-Cummins-PrevenTech-Data-Driven-Engine-Reliability_a5074.html" />
  </entry>
</feed>
